Back to Modern Welding Home

Modern Welding Company

Pressure Vessel Quote Request

 

Use the tab key or the mouse to move between fields

       CONTACT  INFORMATION

 

* NAME:

TITLE:

* COMPANY:

* ADDRESS1:

ADDRESS2:

* CITY:

* STATE:

* ZIP:

* EMAIL:

 * Email will be used to communicate completed RFQ

* CONFIRM EMAIL:

 * Re-Enter Email

* PHONE:

FAX:

* When will you be ready to buy this product?

* Fields required to be completed in  order to process request.

 

 

 

       HOW DID YOU FIND US

 

 AOL Search
 Thomas Regional / Register
 Alta Vista Search
 Equipment House
 Google Search
 Direct Mail Ad
 Yahoo Search
 Magazine Ad
 MSN Search
 Modern Sales Staff
 Infoseek Search
 Previous Customer
Other Search Engine:
Modern Customer:

 
 

 

      VESSEL INFORMATION

          More detailed information will result in a quicker RFQ response

 

     Vertical Vessel
     Horizontal Vessel

Job Site Location:

Vessel Material:

Other Material:

Vessel Contents:

Lethal Service:

Temperature:

° F

Vacuum:

psi

Specific Gravity:

Pressure:

psi

Corrosion Allowance:

in

Vessel Diameter (OD):

in

Vessel Length (T/T):

in

Nominal Capacity:

gal

Insulation:

 

 

       VESSEL SUPPORT

 

 

 Legs

 

 Skirt

 

 Saddles

 

 Support Lugs

       Clearance from vessel bottom to grade: in

 

 

       VESSEL JACKET

 

     Jacket Required? Yes No

Jacket Description:

Temperature:

°F

Pressure:

psi

Vacuum:

psi

Corrosion:

in

 

 

       CONNECTIONS

TYPE WEIGHT
 Slip On
 Weld Neck
 Long Weld Neck
 Lapped-Joint

 150 lb Flange
 300 lb Flange
 Other

 

Size

FLG’D

FLG’D W/ BLIND

FLG’D W/ INT. PIPE

W/ BLIND INT. PIPE

0.75"

1"

1.5"

2"

2.5"

3"

4"

6"

8"

10"

12"

14"

16"

18"

20"

24"

 

 

 

 

Special Flange Requirements:
Gasket Requirements:

 

 

 

 

 

 

 

SIZE

THREADED COUPLING

SOCKET
WELD CPLG

0.25"

0.5"

0.75"

1"

1.5"

2"

2.5"

3"

4"

6"

 

Special Connection Requirements:

 

 

       VESSEL INTERNALS

 

 Trays
 Demisters
 Packed Beds
 

Other:

 

 

 

       VESSEL ACCESSORIES

 

 Lifting Lugs
 Anchor Chairs
 External Ladder
 Internal Ladder
 Ground Clips
 Platform w/Handrails

     Platform Clips Only

 

 

Other Requirements:

 

 

       TANK COATING (EXTERIOR)

 

         Blast Clean

         Primer Coat

         Other Primer

         Top Coat

         Other Top:

         Special Coatings:

 

 

       TANK COATING (INTERIOR)

 

Blast Clean:

Special Coatings:

 

 

       ADDITIONAL INFORMATION

 

  • See Terms and Conditions link below
  • Quotation Good for 7 Days from Date of Inquiry
  • Payment Terms are 1/2% 10 days net 10th of following month
  • Other terms to be determined at the time of order by Modern Welding Co. Credit Manager

 

Terms and Conditions